An official website of the United States government
Here's how you know
Official websites use .mil
A
.mil
website belongs to an official U.S. Department of Defense organization in the United States.
Secure .mil websites use HTTPS
A
lock (
lock
)
or
https://
means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.
Skip to main content (Press Enter).
Toggle navigation
7th Army Training Command
7th ATC
Search 7th ATC:
Search
Search
Search 7th ATC:
Search
Home
About Us
Mission
Our History
Leadership
Staff
Chaplain
G1
G2
G3
G4
G6
G8
IG
MRA
Public Affairs
Protocol
SJA
SHARP
Directorates and Commands
Combined Arms Training Center
Grafenwoehr Training Area
International Special Training Centre
Joint Multinational Readiness Center
Joint Multinational Simulation Center
Noncommissioned Officer Academy
Training Support Activity Europe
Units
Joint Multinational Training Group-Ukraine
Georgian Defense Readiness Program-Training
HHC
Environment
Competitions
Europe Best Sniper Team
USAREUR-AF International Tank Challenge
USAREUR-AF Best Squad
European Best Medic Competition
Exercises
Allied Spirit
Combined Resolve
Dynamic Front
Rapid Trident
Saber Junction
Media & News
Uebungsbetrieb
Newcomers
A to Z
Contact Us
Home
:
Media & News
:
Video
DVIDSVideoPlayer
Playlist:
Search Results
Video by Avery Schneider
Player Embed Code:
Download
Embed
Share
Buffalo Outer Harbor Wetland Ecosystem Phase I Construction
U.S. Army Corps of Engineers, Buffalo District
Oct. 13, 2023 | 4:47
A crane-operated claw onboard a derrick boat places loose stone from a barge to construct a stone breakwater in Buffalo, N.Y., Oct. 13-16, 2023. The breakwater will contain sediment dredged from the Buffalo River, to form the base of a new wetland ecosystem in the abandoned Shipping Slip 3 on the city’s Outer Harbor. (U.S. Army video by Avery Schneider)
00:00 Preparation of stone at the Port of Buffalo
00:15 Wilkeson Pointe park on Buffalo’s Outer Harbor
00:25 The abandoned Slip 3 at Wilkeson Pointe park on Buffalo’s Outer Harbor
01:10 Park and playground area adjacent to breakwater construction site at Wilkeson Pointe
01:30 Preparation at construction site with derrick boat with crane and barges
02:20 Construction of stone breakwater by grabbing and placing loose stone
04:00 Pan from park to derrick boat and tug boat in Slip 3
More
Tags
USACE
Corps of Engineers
Buffalo District
Beneficial Use of Dredged Material
Buffalo Outer Harbor
204 Buffalo RSM
More
Up Next
1:07
Buoys Placed at Slip 3 at Buffalo Outer Harbor
0:59
Pumping Begins at Buffalo Outer Harbor
1:06
Construction Beings at the Buffalo Outer Harbor
Now Playing
Buffalo Outer Harbor Wetland Ecosystem Phase I Construction
1:04
Americans can vote from wherever they are!
2:07
Coast Guard aircrew transports personnel and supplies to Ocracoke Island after Hurricane Dorian
0:29
B-roll of medevac in Elizabeth City after Hurricane Dorian
2:33
Coast Guard Station Oregon Inlet conducts surf drills in Nags Heads, NC
0:19
Coast Guard assists fishing boat taking on water near Hatteras Inlet, NC
0:57
Coast Guard Station Oregon Inlet conducts bar report, towing training in Nags Heads, NC
2:27
Surf's Up with Coast Guard Station Oregon Inlet
3:05
Coast Guard Station Oregon Inlet surf drills
0:33
Moto Monday | Ret Col.Randy "Komrade" Bresnik
1:39
Coast Guard Outer Continental Shelf Industry Day
3:44
Coast Guard Surf Life OBX
More Videos